Engineering & Design Services RFP for Entiat River Silver Falls & Fox Creek Project Areas, Phases 3-4

 
Project abstract: 

Yakama Nation Fisheries is seeking proposals from qualified engineering firms to award a design and engineering services contract in support of salmon habitat restoration activities taking place in the Upper Entiat River Watershed in Chelan County, WA.  The design and engineering contract will take existing conceptual designs to permit level construction plans and eventually to approved final stamped plans for enhancing aquatic habitat in the Silver Falls and Fox Creek Project Areas.  Additional survey may be required on an as needed basis.  Based upon the proposals received under this solicitation the Confederated Tribes and Bands of the Yakama Nation will award a design contract for the Scope of Work described within this RFP.  Services rendered under this contract will be performed through December 31st, 2020.

To create a proposal for the Entiat River Silver Falls & Fox Creek Areas Design Phases 3-4 RFP  please download the Request for Proposals-Details and Directions document (Entiat River Silver Falls & Fox Creek Project Areas Design_Ph. 3-4_RFP.pdf) from the bottom of this webpage and follow the directions provided. 

Please note that bids will be due in Toppenish by Close of Business, on Wednesday February 26th, 2020 in hard copy form.  Only hand deliveries and/or mail parcel delivery service submittals will be accepted 

Bids should be mailed, parcel delivered, or hand delivered to:

Yakama Nation Fisheries
Attn:  Jackie Olney
RE:  Entiat River Silver Falls & Fox Creek Areas Design RFP
PO Box 151
Toppenish, WA.  98948
(Shipping Address:  401 Fort Road, Toppenish, WA.  98948)

Additional Information:

Additional project areas are discussed in the conceptual plans and basis of design report; however they are only included for reading consistency.  Ony those sheets and pages pertinent to the Silver Falls & Fox Creek Project Areas should be used to produce your bid proposal. Those documents are attached to this RFP and can be dowloaded below.. 

  • Entiat River Upper Stillwaters Conceptual Design Report.pdf
  • Entiat River Upper Stillwaters Conceptual Designs.pdf

Status: Completed

01/28/2020 to 02/27/2020
Activity: 
Location Area (Basin, Sub-Basin): 
In partnership with: 
Ecological Concerns: 
Team: 

Project Manager

Additional Project Staff