Natapoc Habitat Enhancement Project (Large Woody Material Option)
This project entails placing large woody material (LWM) along the mainstem Upper Wenatchee River in crib-like structures. The length of the treatment will be for approximately 100 yds. however; the treatment will be non-continuous in favor of utilizing gaps in the riparian canopy as well as further minimizing disturbance to riparian bank vegetation for exact structure placement.