Location:

Wenatchee River (Lower)

Goodfellow/Chotzen Floodplain Reconnection

The proposed Goodfellow/Chotzen Floodplain Reconnection Project (Sunnyslope side channel) utilizes natural processes to restore floodplain functions in an approximately 5-acre area located along the left bank (north side) of the Wenatchee River at RM 1.4. The project will remove a low earthen berm from the floodplain, allowing water from an existing side channel to access a larger portion of its historic floodplain during high flows.

Sunnyslope ELJ

This project created a logjam habitat feature to stabilize approximately 800 feet of eroding left bank on the Lower Wenatchee River. THe large wood was placed above top of bank and will likely interact with the river once the bank erodes.  This project will restore large wood to this portion of the Wenatchee river channel. The large wood will provide complexity and improve fish habitat in addition to stabilizing the eroding bank.

Sunnyslope Side Channel

The Sunnyslope Side Channel Project is located on the Wenatchee River at RM (river mile) 1.4. This excavated side channel is approximately 1,350 feet in length. It is connected to a natural side channel of the Wenatchee River at the upstream end and flows into the mainstem of the Wenatchee River at the downstream end. This project is aimed at creating a groundwater fed side channel with an upstream connection during high flows (approximately 7,000 cfs or greater).