Last modified: Wed, 10/16/2024
- Yakima River Monitoring and Evaluation, 5/1/2023 - 4/30/2024
- Yakima River Basin Chinook and Coho Salmon Monitoring and Evaluation Plan Jan. 2024
- Yakima River Spring Chinook Forecast, 2024 (Preliminary)
- Yakima River Monitoring and Evaluation, 5/1/2022 - 4/30/2023
- Yakima River Monitoring and Evaluation, 5/1/2021 - 4/30/2022
- Bibliography in Support of Supplementation Science, Dec. 2020
- YKFP Project Overview slide show
Last modified: Sun, 10/06/2024
- 12/27/2020 Contaminants Monitoring Framework Columbia River Mainstem Fish Tissue and Water Quality Monitoring Program
- 9/15/2022 Outreach Messaging Framework Columbia River Mainstem Fish Tissue and Water Quality Monitoring Program
- 9/1/2023 Yakama Contaminants Monitoring Framework V2 Update
- Quality Assurance Project Plan Columbia River Mainstem Fish Tissue and Water Quality Monitoring Framework 1/21
- Quality Assurance Project Plan for Implementation of the Columbia River Mainstem Fish Tissue and Sediment Quality Monitoring Pr
Lead project:
Last modified: Wed, 08/21/2024
Lead project:
Last modified: Thu, 06/27/2024
Lead project:
Last modified: Wed, 02/14/2024
Last modified: Fri, 06/30/2023
- 2021 STAR Annual Status and Trends Report
- 2020 Comprehensive STAR report, Yakama Nation Fisheries
- 2019 STAR Annual Status and Trends Report
- 2018 Annual Status and Trends Report Yakama Nation Fisheries
- YN Sturgeon project fact sheet (2018)
- 2017 STAR report- High level graphic subbasin summaries.
- 2017 Comprehensive STAR annual report, covering the activities of YN Fisheries.
- 2016 STAR Status and Trends Report (Update)
- 2015 YN Fisheries Comprehensive Status and Trends Report (Updated 3/2016)
- YN FCRPS Hydrosystem Status Report (2015)
- YN Hatchery and Reintroduction Status Report (2014)
- YN Species Status and Trend Report (2014)
- YN Habitat Restoration Status and Trend Report (more detailed "Web" version) 2013
- YN Habitat Restoration Status and Trend Report (less detailed print version) 2013
- A poster illustrating the structure and content of the STAR project- October 2013
- 2022 STAR report
Last modified: Fri, 05/19/2023
- Exploring Techniques to Reduce Lamprey and Salmonid Entrainment into Canals
- A Pilot Study to Assess the Effects of Sediment Deposition on Larval and Juvenile Lampreys in Prosser, Washington (Chandler Cana
- Intensive Monitoring of Larval/Juvenile Lamprey Entrainment in Irrigation Canals within the Yakima Basin, 2020
Last modified: Sat, 01/14/2023
- YNF_UC booklet.(final).pdf
- Middle Methow Reach Recreational Use Assessment
- Methow River Project Opportunities Assessment: Twisp River to Lewisia Road
- Summary of restoration work at Hancock Springs
- Chewuch Reach Assessment
- Chewuch Reach Assessment Appendix A
- Chewuch Reach Assessment Appendix B
- Lower Twisp River Reach Assessment
- Lower Twisp River Reach Assessment Appendix A
- Lower Twisp River Reach Assessment Appendix B
- Lower Twisp River Reach Assessment Appendix C
- Libby Creek Reach Assessment
- Libby Creek Reach Assessment Appendix A
- Libby Creek Reach Assessment Appendix B
- Lower Peshastin Reach Assessment
- Lower Peshastin Reach Assessment Appendix A
- Lower Peshastin Reach Assessment Appendix B
- Twisp River - Rivermile 0.5 Restoration Concepts Report
- Middle Twisp River Reach Assessment (2015)
- Middle Twisp River Reach Assessment - Appendix A
- Middle Twisp River Reach Assessment - Appendix B
- Middle Twisp River Reach Assessment - Appendix C
- Middle Twisp River Reach Assessment - Appendix D
- Middle Twisp River Reach Assessment - Appendix E
- Middle Twisp River Reach Assessment - Appendix F
- Middle Twisp River Reach Assessment - Appendix G
- Upper Methow River Reach Assessment (2015)
- Upper Methow River Reach Assessment - Appendix A
- Upper Methow River Reach Assessment - Appendix B
- Upper Methow River Reach Assessment - Appendix C
- Upper Methow River Reach Assessment - Appendix D
- Entiat Upper Stillwaters Reach Assessment (2013) with Appendices
- Beaver Creek Reach Assessment (2017)
- Beaver Creek Reach Assessment Appendices B, D & E
- Beaver Creek RA Appendix A
- Beaver Creek RA Appendix C
- Beaver Creek RA Appendix G
- Lower Wenatchee Reach Assessment (Final - 2017)
- Lower Wenatchee RA Appendix A
- Lower Wenatchee RA Appendix B
- Lower Wenatchee RA Appendix C Part 1
- Lower Wenatchee RA Appendix C Part 2
- Lower Wenatchee RA Appendices D, E
- Lower Wenatchee RA Appendix G
- 2019 YNF UCHRP Project Summary.pdf
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 10/21/2022
Lead project:
Last modified: Fri, 09/02/2022
- Master_Agreement_56662_Original-Terms-and-Conditions.pdf
- Master_Agreement_56662_Mod_01-Terms-and-Conditions.pdf
- Master_Agreement_56662_Mod_02-Terms-and-Conditions.pdf
- Master_Agreement_56662_Mod_03_Fully_Executed_11.29.21_YN Protest Letter sm.pdf
- Master_Agreement_56662 Mod_04_GC22_7052_sm.pdf
- Master_Agreement_56662_Mod_06_Fully Executed.pdf
Last modified: Mon, 11/22/2021
Lead project: