RFP - Wenatchee River RM 2.2 Habitat Enhancement Project

Project abstract: 

The Yakama Nation's Upper Columbia Habitat Restoration Project is requesting bids for construction of a Salmon Habitat Enhancement Project to be implemented along the mainstem of the Wenatchee River in September of 2025.  The project will involve all work elements and specifications found in the Project Plans attached to this Request for Bids announcement.

To create a bid for the Wenatchee River RM 2.2 Habitat Enhancement Project please download the RFP Wenatchee River RM 2.2 Habitat Enhancement Project Instructions.pdf from this webpage and follow the directions provided. 

Please note that bids will be due in Toppenish by Close of Business, Wednesday, May 14, 2025, in hardcopy form.  Only hardcopy proposals submitted to Yakama Nation Fisheries via parcel delivery service or postal mail will be accepted.  Bids should be mailed or shipped to:

Yakama Nation Fisheries
Attn: Annet Dillman
RE: Wenatche River RM 2.2
PO Box 151
Toppenish WA, 98948
(Shipping address: 401 Fort Road, Toppenish, WA 98948)
 

We strongly encourage all contractors submitting bids to get their hardcopy packages in the mail by May 8, 2025 to ensure timely delivery. It is also recommended that you email Annet Dillman (dila@yakamafish-nsn.gov) a digital copy of the bid you have submitted as well as a copy of your certified mail certificate for proof of submission.

  • Davis Bacon Wages Apply to this contract.  The winning contractor will adhere to the Davis Bacon rules and comply and submit all necessary paperwork to the Yakama Nation.
  • The Yakama Nation is exempt from state taxes on this project.  Please see the attached Treaty Fishery Exempt Cover Letter and Treaty Fishery Exempt Certificate.  The winning contractor will receive signed copies for their records.
  • This project has adopted by reference in the Engineer's Planset the 2024 Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction.  The 2024 Standard Specifications Maunal can be downloaded here:  https://www.wsdot.wa.gov/publications/manuals/fulltext/M41-10/SS.pdf

Status: Completed

04/16/2025 to 05/15/2025