Bonneville Power Administration and National Oceanic and Atmosphere Administration’s Brush Creek project focuses on addressing a known fish passage barrier. The 175 Road over Brush Creek is one of only two remaining fish barriers in the White Creek Watershed (Tributary to the Klickitat). The White Creek Watershed is identified as a high priority watershed for ESA-listed steelhead. In the Klickitat River Basin, the KLE through the Klickitat Lead Entity Salmon Recovery Strategy document provides guidance on the prioritization of projects throughout the Klickitat River Basin. The 175 Road culverts will be replaced with a bridge, opening up 3.5 miles of high-quality habitat. Under current conditions the three culverts on 175 Road at Brush Creek are full barriers to adult steelhead passage; their removal will eliminate the last fish barrier on Brush Creek.
We are requesting bid proposals for two different construction timelines October 13, 2025 - November 14, 2025 and June 15, 2026 – July 31, 2026. There are two bid sheets for the respective timeframes, Contractors should fill out one or both bid forms depending on availability.
Designs for the structure are being finalized and will be released as Addendum 1. The bridge is a precast concrete and steel modular bridge provided by Janicki Logging.
Videos of the project site can be found here.
Critical Dates:
https://www.zoomgov.com/j/1618721277?pwd=2ZhAW9djjMOGzAnO4ZetUawjZRLUJ2.1