Dry Creek RM 1.8-3.8

Project abstract: 

Yakama Nation Fisheries has developed a restoration design for Dry Creek River Mile 1.8-3.8. This design, informed by a Geomorphic Assessment and Seepage Study, will guide instream and riparian wood enrichment, constructed margin jams, and removal of a spoil pile within the floodplain. These efforts aim to encourage natural wood accumulation, bank erosion for wood recruitment, and activation of floodplains, side channels, and alcove habitat to improve conditions for steelhead lifecycles.

Project Photos:

  • Dry Creek RM 1.8-3.8
  • Dry Creek RM 1.8-3.8