Natapoc Habitat Enhancement Project (Large Woody Material Option)
This project entails placing large woody material (LWM) along the mainstem Upper Wenatchee River in crib-like structures. The length of the treatment will be for approximately 100 yds. however; the treatment will be non-continuous in favor of utilizing gaps in the riparian canopy as well as further minimizing disturbance to riparian bank vegetation for exact structure placement.
Chewuch River Reach Assessment
Goodfellow/Chotzen Floodplain Reconnection
The proposed Goodfellow/Chotzen Floodplain Reconnection Project (Sunnyslope side channel) utilizes natural processes to restore floodplain functions in an approximately 5-acre area located along the left bank (north side) of the Wenatchee River at RM 1.4. The project will remove a low earthen berm from the floodplain, allowing water from an existing side channel to access a larger portion of its historic floodplain during high flows.
Peshastin Creek Reach Assessment
Peshastin Reach Assessment identifies several potential projects in Peshastin Creek.
Sunnyslope ELJ
This project created a logjam habitat feature to stabilize approximately 800 feet of eroding left bank on the Lower Wenatchee River. THe large wood was placed above top of bank and will likely interact with the river once the bank erodes. This project will restore large wood to this portion of the Wenatchee river channel. The large wood will provide complexity and improve fish habitat in addition to stabilizing the eroding bank.
3-D Habitat Enhancement Project
This fish habitat enhancement project recreates habitat that is below historical and potential conditions. A total of 7 logjams were constructed in areas that would naturally accumulate wood, channel migration rates will be slowed while improving fish habitat. Large woody debris (LWD) was partially buried in adjacent banks and it extends out into the active channel. Buried vertical snags are associated with each logjam site to provide stability and increase wood recruitment.
Nason Creek Inner Zone Project Identification
A Reach Assessment (RA) of the Lower White Pine Reach (LWP) of Nason Creek, Chelan County, WA was completed in 2009 by the USBR. The RA examines the condition of fluvial geomorphic processes and the effect on salmonid habitat, and identifies priority restoration strategies and areas. The effort presented in this document builds on the work completed in the RA by identifying more specific project opportunities within portions of the reach.
Twisp River Cattle Management
The Twisp River Cattle Management Project provides riparian protection for Upper Columbia Steelhead in the Twisp River Watershed. The project was done on federal lands in partnership with the United States Forest Service (USFS).
Chewuch River 8 Mile Ranch Project
The 8 Mile Ranch Project (8 Mile Ranch) restores habitat and hydraulic refuge for fish rearing and holding within one reach of the Chewuch River. The work performed provides fish habitat, stream complexity and restores a functional riparian zone in an area currently without any vegetation.
Status and Trends Annual Report
The Status and Trends Annual Report (STAR) Project summarizes fish population status and trends, habitat restoration action implementation, Yakama Nation production and reintroduction programs, and Federal mainstem hydrosystem improvements as they affect Yakama Nation treaty-trust aquatic species and their habitats.